Home > News > Guangzhou Steel Structure Installation general steps (more detailed)
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://m.hengfeng-tools.com

Guangzhou Steel Structure Installation general steps (more detailed)

Time:[2016-4-6]  Hits:5258

Guangzhou Steel Structure Installation general steps (more detailed)

Guangzhou Steel installation general steps:
First, prepare the steel structure installation Guangzhou
(one). Ready to work
 1, the construction organization design and construction organization design of steel structure installation should provide a brief description of the project before, comprehensive statistical quantities, the correct choice of construction machinery and construction method, layout reasonable installation sequence, mainly installed elaborate technical measures, developed strict quality standards and safety installation standard, serious preparation of project schedules, workforce planning and materials supply plan.
 2. Check the pre-construction inspection of construction before the retest, including acceptance, construction equipment and measuring instruments and inspection of steel components based.
(1) Acceptance of Steel member steel members should be construction plans and specifications for acceptance. Steel member is transported to the site, the manufacturer shall provide factory certificate and the following technical documents:
 ① design and design modification documents;
 ② quality steel single or test report and supporting material;
 Test test data ③ high strength bolt friction coefficient;
 ④ plant one or two types of weld inspection reports;
 ⑤ steel members geometry inspection reports;
 ⑥ member list. Installation of this unit should be acceptance, and the actual condition of the structure retest. If the member is damaged in transit, require the production plant must be repaired.
(2) inspection before installation and construction equipment and measuring instruments for important hoisting machinery, tools, wire rope and other accessories shall be tested to ensure reliable performance have to ensure the smooth and safe installation. When installing the measuring instrument has to be regularly assigned to the National Bureau of Standards testing unit for testing, calibration, to ensure accuracy of the measurement standard.
 3, based retest. Steel is fixed in reinforced concrete base (base, capitals, corbels, etc.) on. Thus the base and anchor bolt accuracy, strength to retest. To retest the base level of the base surface elevation, roughness, horizontal position deviation anchors, anchor bolts embedded in the accuracy of the determination made. And the retest results and corrective require delivery of the base construction unit.
 4, preparation of installation plans and component supply plan, organize construction.
 5, check the steel components: Steel Factory member should have factory certification, drawings before installation press review enumeration member, the member is installed in accordance with the order arrived within the scope of the installation, without affecting the installation conditions as far as possible on the installation member lower position to ensure the installation convenience.
 6, installation of steel columns: first determine before lifting member hanging position to determine banding method, take appropriate precautions when lifting. After lifting steel columns when the column foot anchor bolt from about 30-40CM when righting the mounting bolt hole pedestal alignment, slow-fall in place. After the beginning of the school to be vertical deviation within 20MM, tighten the bolts temporarily fixed to decoupling.
 7, steel girder lifting: lifting steel beams after completion of the review column, lifting into place using two symmetrical banding installation hoisting steel beams. After lifting steel beams from the column reference plane 100MM slowly slowly in place, be adjusted to be corrected hoisting steel beams, then a fixed connection. With hanging with the theodolite corrected any time to correct deviations when hoisting steel beams.
 8, wall purlins installation: purlin cross-section smaller, lighter, and more using a hook or a hanging piece lifting method for lifting. Purlin correction is mainly the size and spacing of their own flatness. Check with the kind of pitch along the rod to move back and forth between the bar purlin members, subject to error, to relax or tighten the bolts corrected. Flatness ruler with cable and calibration checks, and finally bolted.
 9, the installation correction
 ①. Steel Column Correction: vertical steel columns correction theodolite or hanging wire hammer test, when the deviation is corrected using the jack, jack the base elevation correction a little elevation, and then increase or decrease the thickness of the plate, tightly immediately after the column foot correction is correct after solid anchor bolts, steel columns until the correct overall correction pouring fine stone concrete column under the soles of the feet fixed.
 ②. Steel Beam Correction: steel beams and vertical axis of the measurement correction, the correction performed using the jack, fixed immediately corrected.

 (two). Wall plate mounting pressure-type color
1. Preparation before construction
①, before the steel sheeting envelope construction and installation, custom corresponding construction drawings, and design and construction personnel training and production safety tests, according to the design documentation organization.
②, detailed check based on the file size and number of types of materials, damage to the pressure plate, flashing boards should be repaired and replaced.
③, various types of construction equipment should be complete, and can operate normally.
④, review and steel sheeting construction installation precision steel components relevant, clear coating installation weld spatter and purlins, and brushing the anti-rust paint for corrosion protection.
 2. Pressure-type color plate construction process: Siding installation by purlins from one location to start, must clenched between the board and the board, and then screws, drywall seams well water treatment. When the pressure plate is installed, it should be laid side edge to adjust its position, while fixed.
 (III). Floor bearing plate installation
 Before floor bearing plate construction, installation, drawing the appropriate row board diagram, according to the construction drawings. Pressure plate along one end of the floor to start laying, laying side edge to adjust its position, while fixed. Entrance case, install pressure plate, then cut the hole sizes according to the actual position of the hole.
 Second, the installation of steel Stability member monomer stabilization and structural overall stability
 1, the monomer component monomer stability stable member refers to a member at the site stack, from the pull, lifting, bending occurs in place during bending and torsion destruction and instability. Thus for thinner and larger member should consider this issue.
 2, the structure of the overall stability of the overall stability structure refers to the structure in the lifting process support system has not been formed, the structure must bear some of the load (including weight). Therefore, in the formulation of the lifting sequence must fully take into account this factor, to ensure that each step in the process of lifting the structure is stable. If the problem can be added other measures to resolve the temporary wind cable.
 Third, Guangzhou Steel installation and connection problems
 Live connection mainly ordinary steel bolts, high strength bolts connecting and welding.
 1, ordinary bolt connection, mainly used by ordinary bolt bending, pulling node. In the main bolt tension. Plus an appropriate prestressing, the shear structure are also used extensively for transmission towers and other connections. After ordinary bolt tightening, exposed threaded be not less than 2-3 button. Common locking bolt should measures, such as double-locking nuts or fastening nut. Bolt hole misalignment smaller reamer or rasp can be used to repair holes, gas cutting may not be used to repair holes.
 2, high-strength bolts, high strength bolts connecting ships directly for important structures to withstand dynamic loads in. Its main feature is to pass through the shear contact surface friction. Therefore, when high-strength bolts installed, practices and rough friction surfaces must be processed according to specifications. Secondly, also for the friction coefficient and torque coefficient test. When you install unscrew the torque to be measured at the beginning and end of the bolt screwing torque.
 3, site welding, site welding plant with welding inspection
 (1) the design of the site should be avoided in soldering
 (2) prevent the adverse weather conditions (rain, wind, cold climate) on construction
(3) reduce the adverse welding station (construction site operation can not rotate, only overhead welding, it is difficult to even settled welding personnel) influence in the process of lifting the steel should pay attention to the problem of the column, when the beam is installed, the main inspection horn column beneath the floor mat whether real, pad level, whether vertical column and the availability of displacement, the degree of vertical and lateral bending vector high primary and secondary beam. After the installation of steel structures formed spatially fixed unit and acceptance, it will require the construction unit in time and space column base plate top surface of the secondary concrete pouring compacting expansion. Finally, we need to check the verticality of the main steel structure and the whole plane bending

 Fourth, the preparation before lifting.
       When the manufacture of steel columns in the column axis design draw feet, on top of the cover shells on cross control lines, control and vertical axis of bolt installation quality control for lifting. Bolted steel construction for general use bolts and high-strength bolts. Ordinary bolts, each bolt end can not be more than two pads gaskets, not use gas cutting reamer bolt holes, bolts tightened after the exposed thread pitch of not less than 2; key control for high-strength bolts bolted rubbing treatment (sandblasted) , anti-slip surface friction coefficient, tightening sequences applied bolting, screwing early final twist, twist applied torque value, the value of the exposed threaded bolt, the gusset plate surface damage and deformation. Installation plate contact surfaces should be smooth, the contact surface must be greater than 75%, the edge of the gap is not greater than 0.8 mm, high-strength bolts should be free to penetrate not be beat and reaming; high-strength bolts shall not be used as a temporary installation bolt, bolt should one direction, bolt mounting every day should be a final twist is completed, a final twist after completion should be individually checked for less twist, super twist should be screwed up or replaced.
Steel Works important quality control points
Embedded quality embedded anchor bolts, anchor bolts directly affect the quality of the installation of steel structures, control bolt (group) position, squareness, length and elevation, and the reaming adjustment to reduce workload (even avoid rework), improve the structural quality of the installation is important. The method can be directly embedded anchor bolts embedded method may also be set aside hole method.
 Fifth, the steel works rainy winter construction measures
 (A) Construction in Winter
 1. Winter construction steel structure fabrication and installation of steel strictly enforced in accordance with the relevant provisions of Winter Construction.
 2. The steel components making positive temperature negative temperature installation should be considered when members shrinkage based on differences in ambient temperature, and adjust the deviation to take technical measures in construction.
 3. Participation negative temperature steel construction welders should be subject to a negative temperature welding technology training, examination, and obtain the corresponding certificate.
 4. The connecting material steel and related negative temperature used be accompanied by a certificate of quality, performance and product standards meet the design requirements.
 5. The negative electrode for use at a temperature more than two hours can not be exposed, more than two hours to re-baking electrode baking times no more than 3 times.
 6. flux prior to use in accordance with regulations baked to a moisture content of not more than 0.1%.
 7. The negative temperature high-strength bolts used shall have a product certificate, and at negative temperature coefficient of torque, axial force re-inspection.
 8. The negative temperature steel structure used coatings not use water-based paints.
 9. The next member feed, should be reserved for the shrinking margin, welding shrinkage and compressive deformation amount should be coordinated with the shrinkage of steel produced in the negative temperatures.
 10. member assembly, according to the order prescribed in the process from the inside out extended group fight, do weld shrinkage experimentally determined values ​​need to be reserved at the time of negative temperature group fight.
 11. component assembly, remove the seam 50mm memory remain rust, burrs, dirt, oil, snow and other debris, dry and free of residual moisture holding seams.
 12. The negative temperature should be at least 9mm steel plate welded to the multi-layer welding, weld surfacing from the bottom up layer by layer, each weld once finished welding, such as welding interruption before applying again to clear welding welding defects. Arc welding is prohibited on the base material.
 13. Steel-site installation, in case of snow or wind speed 6m / s or more, the erection of protective shed.
 14. eradicate substandard weld re-welding, steel welding process in accordance with the provisions under the negative temperature welding.
 15. When the ambient temperature is below 0 ℃, before brushing anticorrosive paint brushing process test, component surface rust, oil, burrs and other things necessary to clean up brushing clean, and keep the surface dry. Snow or ice may not work on brushing member.
 16. Winter transport, steel anti-slip measures taken when stacking, stacking space formation member firm no puddles, no freezing ground. When the same type of members are stacked, members should be kept level, horn on the same vertical line, and prevent slippery member.
 17. Installation according to claim former steel negative temperature conditions, their quality retest of the production and transportation of missed stacking member deformed, repair correction on the ground.
 18. Hoisting ropes should use anti-skid steel members plus septum, and at the same time lifting the gusset plate member, installers need to use the fixtures and other things with a rope lashing firmly.
 19. Preparation of steel components installation sequence chart according to the temperature conditions, in strict accordance with the provisions of the order will be installed during construction.
 20. Preparation installation of steel structures welding process, both ends of a member shall simultaneously be welded.
 twenty one. Before installing remove member surface ice, snow, dew, but not damage the coating.
 twenty two. Negative temperature installation of pillars, main beam immediately corrected permanently fixed position correction right now, the day of installation space member to form a stable system.
 23. The high strength bolt friction joint fitting member may not have snow ice surface, no contact with dirt, oil and other stolen goods.
 24. The negative temperature steel installation quality addition to complying with "Steel construction and acceptance norms" (GB50250-95) requirements, but also according to the design requirements for inspection and acceptance.
 (B) the rainy season construction measures
 1. Rain construction, erection of temporary protection should be shed, rain may not fall on a hot weld. The welding site is wet, wipe with a dry cloth and must be in before the welding with oxy-acetylene flame to dry, keeping the seams dry, no residual moisture.
 2. When lifting, the member if water should be cleaned before installation, but not damage the coating, high-strength bolts when fitting installation member friction surface should be clean, can not have drops, not rain and exposure to dirt and oil and other dirt.
 3. member rainy weather can not be brushing work.
 4. The rain and wind can not be more than five roof insulation construction.
 5. Because of the rain the air is moist, the electrode should be moisture storage and baked, repeat the same electrode baking times should not exceed twice by management in a timely manner grilled record.
 6. The case of windy weather, columns, beams, and other large supporting member should be corrected immediately, permanently fixed immediately after the position correction is correct, to prevent unilateral instability that day installation member, should form steric stabilization system.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
午夜888 | 草草视频在线观看 | 国产一区二区免费 | 最好看的2019年中文在线观看 | 国产麻豆精品一区二区三区 | 日本少妇高潮 | 精品无码一区二区三区 | 91精品一区二区 | 中文字幕一区二区三区精华液 | 三级视频在线播放 | 日韩免费一区二区三区 | 久久精品国产精品 | 日本理论片午伦夜理片在线观看 | 国产欧美精品一区二区 | 亚洲最新av | 中国字幕在线观看免费国语版 | 美女扒开尿口让男人桶 | 国产欧美自拍 | 麻豆av网站 | 亚洲电影一区二区三区 | 日韩激情av | 无码精品一区二区三区在线播放 | 国产一区二区波多野结衣 | 69视频网 | 艳妇乳肉豪妇荡乳xxx | 美丽的姑娘观看在线播放 | 色综合网站| 亚洲精品乱码久久久久 | 国产在线成人 | 国产精品伦子伦免费视频 | 欧美日韩亚洲一区二区 | 日本欧美久久久久免费播放网 | 麻豆久久久 | 午夜免费剧场 | 日本少妇高潮抽搐 | 日本黄a三级三级三级 | 欧美午夜精品一区二区 | 亚洲一区视频 | 成人在线视频免费观看 | 色婷婷丁香 | 亚洲免费网站 | 91久久综合亚洲鲁鲁五月天 | 国产视频99| 成人在线播放视频 | 成人在线小视频 | 国产精品66 | 欧美老肥妇做.爰bbww视频 | 91嫩草欧美久久久九九九 | 中文字幕+乱码+中文字幕一区 | 欧美一级二级三级 | 91视频在线观看 | 国产一区二区三区免费观看 | 性欧美sm调教 | 中国字幕在线观看免费国语版 | 日本a v在线播放 | 国产激情一区二区三区 | 偷拍亚洲色图 | 精品日韩一区二区三区 | 久久久噜噜噜 | 亚洲高清一区二区三区 | 亚洲一区二区三区在线播放 | 欧美亚韩一区二区三区 | 九色91| 一区二区日韩 | 污污视频在线看 | 亚洲熟悉妇女xxx妇女av | 亚洲日本欧美 | 亚洲天堂一区 | 日韩免费 | 水果派av解说 | 亚洲色图图片 | 国产视频a | 国产做爰xxxⅹ久久久精华液 | 在线看91| 国产色片| 成人黄色网 | 国产一区二区不卡 | 国产69精品久久久久久 | 亚洲欧美成人 | 精品成人 | 日韩成人免费 | 一本色道久久综合亚洲精品小说 | 久久精品视频免费观看 | 男生操女生网站 | 97国产成人无码精品久久久 | 美女一级视频 | 91调教打屁股xxxx网站 | 69视频在线观看 | 日韩在线视频一区 | 国产午夜精品久久久 | 一区二区三区四区五区 | 日韩激情av| 国产免费久久 | 激情一区二区 | 国产视频一区二区在线观看 | 久久久久伊人 | 国产伦精品一区二区三区88av | 欧美少妇xxx | av在线中文 | 亚洲精品久 | 久热伊人| 在线观看中文字幕 | 一区二区高清视频 | 国产精品无码白浆高潮 | aa片在线观看视频在线播放 | 中国白嫩丰满人妻videos | 天堂一区| 插曲免费高清在线观看 | 黄色特级片 | 黄色一级网站 | 一级黄色片免费看 | 伊人青青草 | 黄色三级带| 黄色精品视频 | 国产又大又长又粗 | 国产一级大片 | 国产一区二区电影 | 高潮毛片7777777毛片 | 久久久久9999 | 欧美激情视频一区 | 日韩一区二区三区在线观看 | 极品人妻videosss人妻 | 亚洲精品一区二区三区蜜桃久 | 亚洲视频一区二区三区 | 图书馆的女友在线观看 | 日日夜夜狠狠 | 樱桃视频入口在线观看网站 | 免费看黄色aaaaaa 片 | 亲嘴扒胸激烈视频 | 饥渴少妇伦色诱公 | 麻豆视频免费在线观看 | 晨勃顶到尿h1v1 | 体内精视频xxxxx | 在线观看www | 青青草视频 | 一区二区在线看 | 久久久久久久久久久久久久久久久 | 国产亚洲精品码 | 在线免费av观看 | 久久久久中文字幕 | 中文字幕一区在线观看 | 成人黄色一级片 | 国产一区二区三区四区五区 | 毛片网站在线观看 | 99久久99 | 日本三级在线视频 | 成人片免费看 | 中文字幕久久久 | 在线观看网站 | 全部免费毛片在线播放高潮 | 最好看的2019年中文在线观看 | 日韩成人av电影 | 国产主播福利 | 毛片免费视频 | 欧美香蕉| 欧美黄色录像 | 日韩二区三区 | 日本xxxxxⅹxxxx69 | 午夜精品福利视频 | 亚洲色图50p | 少妇熟女视频一区二区三区 | 91黄色在线观看 | 九九精品国产 | 欧美人性生活 | 黄色av电影 | 美女啪啪网站 | 中文字幕二区 | 日本一区二区视频 | 日本超碰 | 成人国产精品久久久网站 | 精品视频网 | 毛片无码一区二区三区a片视频 | 久久h| 日韩一区二区三区四区五区 | 日韩一区二区三区在线 | 日本少妇xxxx软件 | 亚洲在线免费 | 五月天一区二区 | 久久久久国产一区二区三区 | 国产crm系统91在线 | 黄色一级大片 | 日韩性视频 | 外国一级片 | 国产精品久久久久无码av | 九九香蕉视频 | 中国免费av| 奇米狠狠| 综合久久久久 | 完美搭档在线观看 | 全是肉的高h文〈男男〉 | 亚洲熟女乱色综合亚洲av | 美日韩精品| 亚洲欧洲一区二区三区 | 丝袜脚交免费网站xx | 德国空姐2电影在线观看 | 欧美丰满少妇人妻精品 | 99热这里| 能看的黄色网址 | 免费一级a毛片夜夜看 | 男女交性视频播放 | 影音先锋丝袜 | 91精品一区二区 | 成人伊人网 | 美女被到爽高潮视频 | 日日夜夜艹| 欧美超碰在线 | 国产喷水视频 | 亚洲色图一区二区 | 亚洲激情视频在线观看 | 午夜激情av| 成人午夜在线视频 | 日韩三级在线播放 | 久久激情视频 | 亚洲观看黄色网 | 欧美aⅴ| 成人手机在线视频 | 特一级黄色片 | 日韩成人在线视频 | av免费在线观看网站 | 双性高h1v1 | 91网站在线免费观看 | 末路1997全集免费观看完整版 | 韩国禁欲系高级感电影 | 玖玖成人| 日韩成人在线视频 | 国产黄色片在线观看 | 在线你懂| 欧美怡春院 | 麻豆传谋在线观看免费mv | 丁香花完整视频在线观看 | 国产在线拍揄自揄拍无码视频 | 欧美97| 国产真实乱人偷精品人妻 | 四虎新网址 | 国产午夜激情 | 97在线观看免费高清 | 丝袜脚交免费网站xx | 夫妻淫语绿帽对白 | 精品国产av色一区二区深夜久久 | 日韩免费视频一区二区 | 一级黄色电影片 | 欧美成人乱码一区二区三区 | 久久精品视频在线观看 | 亚洲熟妇色自偷自拍另类 | 日韩中文字幕在线播放 | 国产激情小视频 | 国产精品乱码一区二区 | 黄色污污视频 | 国产网站在线 | 欧美一区二 | 大地资源中文在线观看免费版 | 欧美性猛片aaaaaaa做受 | 亚洲av无码国产精品久久不卡 | 在线看视频 | 在线视频第一页 | 国产成人精品视频 | 麻豆一级片| 国产真人无遮挡作爱免费视频 | 麻豆网站| 亚洲狠狠干 | 亚洲色欧美 | 久久精品久久久久 | 亚洲福利在线观看 | 一级在线 | 亚洲狠狠干| 一边摸一边抽搐一进一出视频 | 黄色精品网站 | 天天操天天操 | 黄色免费在线视频 | 欧美日韩国产在线观看 | 国产成人精品在线观看 | 成人黄色小视频 | 青青青操 | 自拍视频国产 | 欧美高清| 穿扒开跪着折磨屁股视频 | 欧美一级在线 | 欧美乱码精品一区二区三区 | a级片网址 | 91麻豆精品国产 | 欧美1区2区 | 欧美色性 | 毛片免费全部无码播放 | 欧美激情久久久 | 500部大龄熟乱视频 国产免费无码一区二区 | 黑料网在线观看 | 在线观看av网站 | 小视频免费观看 | 久久这里只有 | 国产一区二区在线播放 | 永久免费,视频 | 欧美一区二区三区在线 | 成人黄色电影网址 | 高清乱码免费看污 | 欧洲熟妇的性久久久久久 | 老司机成人网 | 精品乱子伦一区二区三区 | 欧美精品黑人猛交高潮 | 久久久精品影院 | 国产熟女高潮一区二区三区 | 亚洲一区二区中文字幕 | 麻豆av在线 | 国产一区二区在线看 | 91视频大全 | 男女日批视频 | 成人在线网 | 亚洲成人国产 | 久久视频在线观看 | 青春草视频 | 日本成人网址 | 久久午夜视频 | 邻家有女4完整版电影观看 国产ts丝袜人妖系列视频 | 国产在线网址 | 亚洲不卡在线 | 日韩高清国产一区在线 | 欧美乱妇狂野欧美在线视频 | 波多野结衣毛片 | 玖玖在线视频 | 色哟哟入口国产精品 | 丁香六月婷婷 | 欧美中文字幕 | 日本在线视频观看 | 日韩第一页 | 极品一区| 久久久www成人免费精品 | 欧美日韩成人 | 七七88色 | 日韩色网 | 91成人在线观看喷潮动漫 | 亚洲一区二区三区在线视频 | 日本精品视频 | 东北少妇露脸无套对白 | 日韩免费高清 | 国产人成一区二区三区影院 | 日韩欧美色 | 欧美色综合| 欧美日韩精品一区 | 91小视频在线观看 | 黄色免费网 | 国产a区 | 日本69熟| 国精产品99永久一区一区 | 97视频网站| av片在线看 |